Licensed Journeyman Electrician
Apply Now$64/HR + $175 DAILY PER DIEM | Licensed Journeyman Electrician (Ground-Up Data Center)
Position: Licensed Journeyman Electrician (Class A / Licensed)
Location: Cedar Rapids, IA (Jobsite: 6270 76th Ave SW, Cedar Rapids, IA 52228)
Pay Rate:$64.00 / hour (Weekly Pay)
Per Diem:$175.00 / day
Schedule: 50–60 Hours/Week | Long-Term Multi-Phase Project
Start Date:IMMEDIATE START AVAILABLE
Job SummaryFinish Line Staffing is immediately hiring Licensed Journeyman Electricians for ongoing, large-scale ground-up data center infrastructure construction located in the Big Cedar Industrial Center in Cedar Rapids, IA.
If you hold an active Iowa Class A Journeyman License or an active license from a recognized reciprocal state (AK, AR, CO, MN, MT, NE, NH, ND, OK, SD, TX, WI, WY), we can get you onboarded and dispatched to site immediately.
Key ResponsibilitiesExecute basic to advanced electrical installations for a multi-building mission-critical data center campus.
Install underground electrical pathways,heavy conduit systems,and main service feeder runs.
Set and align transformers,switchgear,switchboards,industrial backup generators,and distribution panels.
Cable tray installation,wire pulling,terminating medium/low voltage feeds,and ground grid installations.
Work strictly under safety guidelines (OSHA 10, NFPA 70E) and current NEC standards.
Licensing: Active Iowa Class A Journeyman License OR an active Journeyman Electrician license from a reciprocal state (AK, AR, CO, MN, MT, NE, NH, ND, OK, SD, TX, WI, WY).
Experience: Proven industrial or commercial electrical background; prior data center, mission-critical, or ground-up construction experience preferred.
Tools & PPE: Standard Journeyman hand tools, cordless drill, and hard hat/safety gear.
Reliability: Valid driver’s license, reliable transportation, and commitment to immediate start.
Base Pay:$64.00 per hour
Per Diem:$175.00 per day
Weekly Overtime: Consistent 50–60 hour work weeks available
Project Duration: Long-term, ongoing multi-year campus buildout